Meters: Measurement Guidelines and Tap Procedure
The documents below cover the material, fabrication, construction, specifications, and maintenance for the installation of preferred production measurement facilities connected to Peoples.
Production Meter Ownership Transfer
All acquisitions or sales of production meters are required to go through a Meter Ownership Transfer. Peoples requires a transfer notice (completed via the form below) within 15 days of the sale. If a transfer is not made within 15 days, Peoples has a right to terminate the agreement and disconnect the meter from our pipeline.
To request a Meter Ownership Transfer, please complete the form. Once complete, click the Submit button at the bottom of the pdf form.
For more information on Meter Transfers, please contact Gabriella Albert at 412-258-4714 or Gabriella.Albert@peoples-gas.com
Production Meter Set Specifications - LP & HP
To review the specifications necessary to fabricate a low-pressure (175 psig MAOP) or a high pressure (740 psig MAOP) production station meter set for Peoples, please visit the Meter Drawings and Specs page.
Peoples' Approved Gas Production Meter Set Drawing
For detailed specifications of our Approved Production Meter Set Drawing, click here.